Contracts | 07 May 2024
What are the different types of standard form contracts?
Various standard form contracts are commonly used to govern relationships and responsibilities among parties involved in construction projects. These contracts are developed by industry organisations and professional bodies to provide a consistent framework for construction agreements. Here are some of the key standard form contracts used in the UK construction industry:
1. Joint Contracts Tribunal (JCT) Suite:
- The JCT suite is one of the most widely used standard form contracts in the UK construction industry. It covers a range of contract types catering to different project structures. Examples include:
- JCT Standard Building Contract (SBC): Suitable for traditional procurement where the contractor is responsible for both design and construction.
- JCT Design and Build Contract (DB): Used for design and build procurement, where the contractor is responsible for both design and construction.
- JCT Intermediate Building Contract (IC): Suitable for projects of intermediate value and complexity.
- JCT Minor Works Contract (MW): Designed for smaller, less complex projects.
- JCT Management Building Contract (MC): Used for construction management procurement.
2. New Engineering Contract (NEC) Suite:
- NEC contracts are known for their emphasis on collaboration and project management. Key contracts within the suite include:
- NEC3 Engineering and Construction Contract (ECC): Used for engineering and construction projects.
- NEC4 Engineering and Construction Contract (ECC): An updated version of NEC3, providing additional features and improvements.
3. Fédération Internationale des Ingénieurs-Conseils (FIDIC) Contracts:
- FIDIC contracts, while not specific to the UK, are internationally recognized and widely used in the UK construction industry for international projects. Key contracts include:
- FIDIC Red Book: Conditions of Contract for Construction.
- FIDIC Yellow Book: Conditions of Contract for Plant and Design-Build.
- FIDIC Silver Book: Conditions of Contract for EPC/Turnkey Projects.
4. Institution of Civil Engineers (ICE) Forms:
- ICE provides standard forms of contract for civil engineering projects. Notable contracts include:
- ICE Conditions of Contract (7th Edition): Used for civil engineering works.
- NEC3 and NEC4 Option X12: Adaptable to suit the needs of the project.
These standard form contracts serve as a starting point for construction agreements, but they are often modified or supplemented to suit the specific requirements of individual projects. Legal advice is commonly sought to ensure that the chosen contract aligns with the parties' intentions and the unique characteristics of the project.